Alioth Engineering - works in the Heat and Power Plant in Łódź

year: 2021

Tests of pipelines of turbine sets of power unit 1 of ENERGA Elektrownie S.A. Ostrołęka. Adjustment of the boiler suspensions of the main steam transport pipelines in ENERGA Elektrownie S.A. Ostrołęka. The works were carried out on time, accepted by protocol with the Ordering Party. No comments were made as to the performance of the works.

Works on the modernization of the boiler at the Ostrołęka Power Plant

year: 2021

Tests of pipelines of turbine sets of power unit 1 of ENERGA Elektrownie S.A. Ostrołęka. Adjustment of the boiler suspensions of the main steam transport pipelines in ENERGA Elektrownie S.A. Ostrołęka. The works were carried out on time, accepted by protocol with the Ordering Party. No comments were made as to the performance of the works.

Modernization support Alioth Engineering at Kozienice Power Plant

year: 2021

Modernization of the fastenings of the main power units' pipelines for ENEA Wytwarzanie Świerże Górne. Renovation and replacement of water superheater elements of power units for ENEA Wytwarzanie Świerże Górne.

Reconstruction of external fastenings of the main pipelines of steam power units for ENEA Wytwarzanie Świerże Górne. The works were carried out on time, accepted by protocol with the Ordering Party. No comments were made as to the performance of the works.

Modernization of fixings for Kozienice Power Plant

year: 2021 / Doosan Babcock Energy Polska S.A.

Modernization of fastenings of the main pipelines of units 3 and 8 in ENEA Wytwarzanie Sp. z o.o. Kozinice Power Plant in 2021 - adjustment and maintenance of fastenings for fresh and secondary steam pipelines with outlets to safety valves.

The total amount of the order: PLN 3,321,000.

Modernization of fixings for Kozienice Power Plant

year: 2020 / Doosan Babcock Energy Polska S.A.

Modernization of fastenings of the main pipelines of units 1, 4 and 5 in ENEA Wytwarzanie Sp. z o.o. Kozinice Power Plant in 2020 - adjustment and maintenance of fastenings for fresh and secondary steam pipelines along with outlets to safety valves.

Total order amount: PLN 4,356,045.

Works on the OP-650 ENEA boiler

year: 2020 / ENEA Wytwarzanie Sp. z o.o.

Preparation for non-destructive tests and auxiliary works during diagnostic tests on OP-650 boilers No. 1, 4 and 5 at ENEA Wytwarzanie Sp. z o.o. Kozienice Power Plant in 2020. Thickness tests and MT diagnostics of screen chambers, inlet and outlet chambers, desuperheaters, connecting pipelines and water heater coils.

Total order amount: PLN 382,530.

MPM-BMD of the DN500 gas pipeline

year 2020 / Gas Transmission Operator Gaz System S.A

Research by the Magnetic Metal Memory (MPM-BMD) method of the DN500 gas pipeline from Poznań to Rogoźno, as well as sections of high pressure gas pipelines. Agreement for the entire year 2020.

The total amount of the order: PLN 231,855

Comprehensive NDT examination

year: 2019 / Stora Enso Poland S.A Ostrołęka

Preparation of the surface for tests and NDT tests, including tests of inter-rollers with the assessment of the stress-strain state in the near-roll zone with crack detection and thickness measurement on the Stora Enso Poland S.A Ostrołęka sodium boiler in 2019.

The total amount of the order: PLN 131,000.