Alioth Engineering, has announced the completion of tests conducted on the Power Plant in Ostrołęka. The tests were aimed at assessing the efficiency, safety and modernization of the power plant’s infrastructure, and their completion represents an important step towards increasing the efficiency and reliability of this key energy unit power plant.
During testing a team of employees from Alioth Engineering focused on a wide range of aspects of the power plant, including assessing the the technical condition of equipment, grid infrastructure and safety. Using state-of-the-art diagnostic methods and analytical tools, Alioth was able to thoroughly examine the existing infrastructure of the power plants and identify areas where improvements can be made.