Alioth Logistics has undertaken work for the Gaz-System industrial gas pipeline operator. The works started at the beginning of October include research and diagnostics of over one hundred kilometers of gas pipelines.
The tests consist in determining the route of the gas pipeline, determining the depth of the deposition and detecting stress concentration zones in order to remove the defect. The works will last until the end of December this year.